Bathroom Remodeling
From simple refreshes to full reconfigurations, we remodel bathrooms across the Dallas–Fort Worth metroplex — showers, tubs, tile, vanities, and fixtures, finished clean and on schedule. Our crews control dust, clean up daily, and treat the one-bathroom-house problem like the emergency it is.
Refresh or full remodel?
A refresh — new vanity, fixtures, mirror, paint, maybe a reglazed tub — can transform a bath in days. A full remodel means new shower or tub, tile, plumbing reconfiguration, and sometimes layout changes. We will show you both options with real pricing so you can decide what the bathroom is worth to you.
What goes into our baths
Showers and tubs, tile (floors, walls, niches), vanities and tops, faucets and fixtures, lighting, ventilation, and paint. We waterproof properly behind the tile — the part you never see is the part that matters most.
Living through it
Bathroom remodels run one to three weeks depending on scope. We seal off the work area, run dust control, clean up every day, and sequence the work so you are never without a working toilet longer than absolutely necessary.
Common questions
How long does a bathroom remodel take?
Refreshes: 3–5 days. Full remodels: 2–3 weeks. Tub-to-shower conversions: about a week. You get the schedule in writing before we start.
Do you do small bathrooms?
Absolutely — small baths are most of what we do. Smart layout and the right tile choices make a 5×8 bath feel twice its size.
Can you match my existing tile?
We will try, and we are honest when a match is not possible — then we design a deliberate contrast instead of a near-miss.
Get a free inspection
Every project starts with a free, photo-documented inspection and an honest assessment. No pressure, no obligation.